We review your details within two working days and coordinate directly with your plumber if needed — by phone or email. Every technical question is settled before installation day.
You receive a fixed date with a specific time. From that moment you can firmly announce your reopening to clients.
Our team installs your loungers turnkey — including pressure test, DGUV V3 inspection and training. The next day you welcome your first client.
Our team arrives between 7:00 and 9:00. A typical installation for one to three loungers takes about six to eight hours.
The Grundfos Sololift2 C-3 lifting station serves up to three Wakamizu loungers at once — via three separate DN40/50 inlets.
Cold and hot water with 25 mm Smartpress fittings, cleanly routed in a floor cable duct. DN32 → DN40 reduction at the wall.
A dedicated circuit with RCD protection to standard — on request we install the socket for you.
A Grohe Sense floor sensor detects water on the floor and alerts in real time.
Every system is pressure-tested and electrically certified to DGUV V3 — protocol and certificate handed over on the spot.
ABS basin, height 68–83 cm, up to 250 kg, CE-certified. A service gap of about 10 cm is planned.